Clare House Retirement Home Extensions
Supreme Site Works have been involved in the excavation and preparation of infrastructure for the Clare House retirement home extensions, which include five new villas. Clare House Retirement Village is part of the Waikiwi retirement complex, which is set on an acre of garden, with a rest home facility, a 28-bed hospital wing, two two-bedroom apartments, 12 one-bedroom apartments and four studios.
The work involved organising water, sewer and stormwater connections, excavation and construction of the granular base for the foundations of the villas, excavation and construction of the road, kerbs and driveways.
Supreme Site Works was awarded the contract from the builder to build the concrete foundations for the five villas. This includes boxing the perimeter and laying the steel and concrete. The five new villas are set to be built by April 2019.